THE MORRIS Lift Bridge 45 by the Prees Branch on the Llangollen Canal has failed.
This has closed the navigation, Keith Gudgin reports.
The reason given is maintenance, after it failed on Monday, though only today, Friday, given notice of the failure.
An 'issue'
There seems to be an 'issue' with its operation that is causing a risk with the navigation that is closed to prevent further risk with the lift bridge being inoperable.
There is no information of what either the issue or the risk is.
The trust's engineering team is working with contractors to determine a resolution to the problem.