THE DETERIORATION OF Iron Lock 11 on the Llangollen Canal means its work has been brought forward.
- Details
HOPE SPRINGS AT LOCKSIDE CAFÉ with new events after the Llangollen Canal collapse.
- Details
A DESIGN HAS BEEN CHOSEN to repair the breach on the Whitchurch Arm of the Llangollen Canal.
- Details
RESIDENTIAL MOORINGS ON THE CAM in Cambridge were closed in 2022 as locks were being repaired.
- Details
THE RIVER CANAL RESCUE (RCR) reports it responded to 123 major incidents in 2025—emergency situations involving mainly grounded boats—less than the 171 reported in 2024.
- Details
THE OBSTRUCTION BLOCKING THE USE of Keadby River gates has been removed.
- Details
THE NEW PADDLES that were required for Lock 4 on the Glasson Branch have been received and work has started on their installation.
- Details
THE REPAIRS TO THE Sutton Weaver Swing Bridge have been completed ahead of schedule.
- Details
AS WE REPORTED, a load of rubble was illegally tipped into the Walsall Lock Flight.
- Details