THE HUDDERSFIELD NARROW was closed yesterday, as repairs are needed.

PaddockFootLock5EThese are to repair a retaining wall on Lock 6E, Paddock Foot Lock, Keith Gudgin reports.

Yet the contractors need two full weeks to undertake this, a fairly simple job. With the lock closed for two Mondays' to Fridays'.

Offside retaining wall

It is the offside retaining wall that needs the repair.

The Canal & River Trust advise that this is being done now, and added to the winter works list, to save possible failure during the actual boating season.

How it is known such repairs now all too often require multiples of weeks—always Monday to Friday—is never stated. Photograph courtesy of Pennine Waterways.