THE STOPPAGE ON THE Loco Lift Bridge on the Huddersfield Broad Canal was sorted last Friday the 17th.
But was closed again today, Monday 20th, Keith Gudgin reports.
Engineers will attend the site today to investigate the issue and then determine what repairs are required.
Reopened
Yet it was only on Friday that the bridge was reopened after engineers removed a snapped key in the lock.
This then closing the bridge to navigation whist the remains of the key was removed.
Thus then enabling the lift bridge then able to function again. And the navigation reopened.